U.S. Army STAND-TO! | Powering the Force |
: Added: Dec 11, 2014 4:52 pm
CDAT Netica Exhaust Temperature BBN |
REQUEST FOR INFORMATION (RFI) FOR:
FIELD SUPPORT DIRECTORATE CECOM EQUIPMENT DIAGNOSTIC ANALYSIS TOOL (CEDAT): SYSTEM INTEGRATION AND SOFTWARE DEVELOPMENT TACTICAL POWER AND TRANSMISSION.
Responses to this Source Sought are due by 0800 EST (APG, MD) 23 December 2014.
Please submit all RFIs to Christopher Laird, Contract Specialist, christopher.m.laird2.civ@mail.mil. Subject line must read
RFI W56KGY-15-R-F005 quote mark Company Name quote mark.
Synopsis:
The contractor shall provide the functional services, personnel, and materials related to Training, Total Package Fielding (TPF) IAW AR 700-142 and Sustainment on Tactical Operations Center (TOC) Power.The contractor shall provide complete courses of instruction:
- Power Generation:
- STT on board generator through 200KW
including depot level troubleshooting and repair. - Electrical knowledge of power
generation operations - knowledge level equivalent to journeyman level or
greater. - expert engineering support on the
- TOC power grid system with licensed electrician.
- Trailer Mounted Support Systems (TMSS) and vehicle mounted
air-conditioned units with Universal Licensed Heating Ventilation and Air
Conditioned (HVAC) certified instructors (Universal license Section 1 & 2
under the EPA). - Operational and maintenance knowledge of Tactical EnvironmentalControl Unit (ECU).
- Operational and maintenance knowledge of Power Distribution
InstallationIllumination System Equipment (PDISE) and similar equipment. - Tactical Transmission: The contractor shall provide competent trainers for Tactical Transmission. The contractor may be required to provide:
- - SINCGARS
- - Multiband Radios: PSC-5 and 5D, PRC-117F and G, PRC-152
- - Planning and management of the Combat Radio Network
- - Secure Mobile Anti-jam Reliable Tactical Terminal(SMART-T)
- - Global Broadcast System (GBS)
- - TROJAN Spirit
- - Satellite systems (including STT, SNAP, NCW, and GBS)
- - Line of sight systems (such as 7800W, UHF and SHF)
- - Light Counter-Mortar Radar (LCMR)
- - Harris 117G
- - Harris, Highband Network Radio (HNR)
- - Rockwell Collins/Quint Networking Technology (QNT)
- - Tactical Targeting Network Technology (TTNT) Syntonics
- - High Antennas for Radio Communication (HARC)
- - EPLRS - Enhanced Position Location Reporting System
- - Fiber Optic (certification required)
- - Tactical Fiber Optic (certification required)
- Computer Based Maintenance CBM:
- Contractor will develop 6 (ea) Netica Baysian BeliefNetworks (BBNs) (3 CBM +/pre-failure; 3 Cyber Depot/Virtual LAR, post-failure) over period of performance (knowledge engineering and Netica input).
- Contractor must have breadth and depth of knowledge on all aspects, systems, and subsystems on the HARC 2S and on the PGSS and PTDS platforms that integrate with the HARC 2S. Contractor must display phased knowledge of the HARC 2S development and integration process to include logistics, engineering, and test.
- Contractor will provide an Expert Knowledge Elicitation Environment (EKEE) as a developed and robust program for improving the knowledge engineering process for development of BBNs.
- Contractor will perform pre-elicitation research, design, integrate and test Graphic User Interface (GUI) for Netica BBNs with repository for configuration/version/revision utilizing Netica, Java, Visual Studio, and BaseCamp. Contractor will provide:
- Knowledge engineering and development of Bayesian Belief Networks (BBNs) for pre-failure diagnostics (CBM + EOA.) This involves elicitations/consultations with subject matter experts and development /testing of BBNs using the Netica software application for specific EOA sensors on PHM-enabled tactical generators.
- Knowledge engineering and development of Bayesian Belief Networks (BBNs) for post-failure diagnostics (Cyber Depot/Virtual LAR.) This
involves elicitations with subject matter experts and development/testing of
BBNs using the Netica software application for specific tactical generator
sub-systems. - Design of Graphical User Interface (GUI) for BBNs for both EOA and Cyber Depot/Virtual LAR BBNs.
- Programming/Coding of GUIs for each BBN Lab testing and operational testing of combined BBN and GUI deliverable
- Contractor shall provide an advanced technical approach to assist in providing services to support BBN development in all areas of creation, testing and deploying the BBN models and associated software as set out below.
- 1) Pre-Failure Diagnostics. Development of BBN models to detect problems on individual diesel generators before they fail.
- 2) Post-Failure Diagnostics. Development of BBN models to identify the cause of a failure after it occurs, again on individual diesel generators as a forensic process.
No comments:
Post a Comment